Private beta · two operators

An asset is overdue long before it fails. Nobody has it on a screen.

Vigora is the inspection registry for pipeline integrity, battery pads and distribution. Every asset carries a criticality class, the class sets the interval, and the interval puts the asset on a board that someone actually looks at. A classification is not closed until an engineer signs it.

Request a beta slot
Open the board

Criticality classes · Interval derived from class · Engineer signature required

The board · five assets

ASSET

TYPE

CLASS

LAST INSPECTION

OVERDUE

STATE

PD-2291

ducto 6 pulgadas

class 1

last 14/08

9 days overdue

OVERDUE

DEFECT

pérdida de espesor, tramo 40 m

Source: inspection photo

CLASSIFICATION PROPOSED

class 1

Source: model, confidence 0.81

STATE

awaits signature by R. Cáceres, matrícula 4-1182

Sample data. Not a sign-off.

BT-0447

batería

class 3

last 02/09

2 days overdue

OVERDUE

TR-1180

transformador 13,2 kV

class 1

today

n/a

SCHEDULED

PD-2305

ducto 4 pulgadas

class 2

in round

n/a

CLASSIFIED

EL-8821

columna 33 kV

class 2

signature pending

n/a

PENDING SIGNATURE

Sample data. Not a sign-off.

An interval that lives in a spreadsheet is an interval nobody keeps.

Integrity intervals are set by criticality, and criticality is set by an engineer looking at a defect. That chain is sound until the register moves to a spreadsheet, where the class becomes a column nobody sorts and the date becomes text.

An asset three days overdue does not announce itself. It sits in row 400, under a merged cell, until the next audit or the next loss of containment.

The registry is not paperwork around the inspection. It is the thing that makes the interval visible, and the thing that refuses to close without a signature.

A SPREADSHEET CANNOT

WHAT IT COSTS

Derive an interval from a class

every interval is typed by hand

Show what is overdue, first

overdue assets surface at audit time

Block closure without a signature

re-inspection closes on an empty field

Three stages. The last one is not the inspector’s.

1

Program

Assets enter the round by interval, in route order, on the inspector’s device, and the device works offline.

2

Classify

The inspector photographs, describes and proposes a class. The model pre-classifies from the photo and shows its confidence.

3

Sign

An engineer with the licence for that asset class signs or corrects. A correction needs a written justification and resets the interval.

Full pipeline

Four classes, four intervals, one board.

The class is the only thing that moves the date. Classes are defined with the client, mapped to their own standard, and every change is versioned. There are four criticality classes, with intervals of 30, 90, 180 and 365 days.

CLASS

MEANING

DEFAULT INTERVAL

1

loss of containment plausible within 12 months

30 days

2

degraded, monitored

90 days

3

stable, watch

180 days

4

no defect, routine

365 days

Registry detail

The inspector does not sign what the inspector classified.

Separation is the whole point. The person who classified proposes; an engineer with the matching licence and asset class disposes.

01

Signature rights are per licence and per asset class.

02

A correction requires a written justification, minimum 200 characters.

03

A correction resets the interval and is logged against the inspector.

04

A signature is stamped with licence number, time and device.

Sample data. Not a sign-off.

What the supervisor opens on Monday.

Overdue first, then pending signature, then the round. The board is the landing screen, not a report you have to build.

·

overdue by days and class

·

pending signature with age

·

assets without an interval

·

inspectors with a correction rate above threshold

·

assets with no inspection in 18 months

The board and intervals

The photo was always taken. Nobody read it.

Inspectors have photographed defects for a decade. The photos went to a drive and were read by whoever had time, weeks later, usually the same engineer who then signed from memory.

A vision model reading the photo at the point of capture changes the order of the work: the class is proposed in the field, the engineer reviews instead of discovering, and the interval is set the same day.

Three things stay off the model.

01

Internal defects, which need in-line inspection and are received but not inferred.

02

Remaining-life calculation, which stays with the engineer.

03

Cathodic protection readings, which are imported and not judged.

Where the assets already live.

Vigora writes only the inspection record and the work order reference.

SOURCE

MODE

GIS

read WFS

CMMS

read and write work order

SCADA

read tags

In-line inspection reports

PDF import

Anything else

CSV

Registers already past four thousand assets.

FOR

Operators and distributors with a written criticality scheme and a licensed engineering bench.

NOT FOR

Registers under 500 assets, and operators with no written scheme, who need the scheme before the software.

Per inspector seat, with an asset ceiling.

A monthly seat and an asset ceiling. The ceiling exists because the board gets slower with the register, and slowness is our cost, not yours.

Bands

Where it breaks.

01

Corrosion under insulation, invisible from outside.

02

Photos without a scale reference.

03

Angle welds with ambiguous geometry.

04

Night captures under 200 lux.

All limits

Questions we get.

No. It removes the discovery. The engineer still classifies and signs.

Only if they hold a licence and the asset class, and never on a case they classified themselves.

No. Classes are mapped to your standard and versioned. We do not impose intervals.

The round runs offline and syncs on return. Signatures need a connection.

Encrypted, Toronto, DigitalOcean. Sixty months, hard delete on request.

Where this goes.

One stage at a time, and only after the previous one holds.

TODAY

The registry, the board and the signature.

NEXT

Defect recurrence by asset family.

LATER

Interval tuning from the client’s own history.

Two people.

Vigora SAS, Ruta 22 km 1210, Neuquén. Founded 2026.

Ramiro Cáceres, portrait

Ramiro Cáceres

PRODUCT

Eleven years in pipeline integrity, the last four on the operator side. Holds the licence he now designs around.

Lucía Bejarano, portrait

Lucía Bejarano

MACHINE LEARNING

Vision and defect classification.

Team

We are taking two more operators.

Tell us how many assets you carry and where the register lives today. We reply from a person within two business days.

Request a beta slot
ramiro@vigora.com.ar

Create a free website with Framer, the website builder loved by startups, designers and agencies.