Overdue first, always.
The board is the landing screen. It sorts by days overdue, then class, and it does not hide behind a filter.
PD-2291
ducto 6 pulgadas
class 1
last 14/08
9 days overdue
OVERDUE
DEFECT
pérdida de espesor, tramo 40 m
Source: inspection photo
CLASSIFICATION PROPOSED
class 1
Source: model, confidence 0.81
STATE
awaits signature by R. Cáceres, matrícula 4-1182
Sample data. Not a sign-off.
BT-0447
batería
class 3
last 02/09
2 days overdue
OVERDUE
TR-1180
transformador 13,2 kV
class 1
today
n/a
SCHEDULED
PD-2305
ducto 4 pulgadas
class 2
in round
n/a
CLASSIFIED
EL-8821
columna 33 kV
class 2
signature pending
n/a
PENDING SIGNATURE
Sample data. Not a sign-off.
Overdue
Assets past their date sit at the top, sorted by days overdue and then by class. Nothing is collapsed behind a filter.
Pending signature and age
Classifications waiting for an engineer show how long they have waited. A classification is not closed until it is signed.
Assets without an interval
An asset with no class has no interval, so it shows here as a gap. It is not given a default.
Correction rate by inspector
Inspectors whose correction rate runs above a threshold are listed, so the supervisor can see where classification needs review.
Eighteen-month gaps
Assets with no inspection in 18 months are listed, whatever their class.
Weekly digest and who receives it
The digest goes out Monday at 07:00 to the supervisor and the engineering lead. It cannot be switched off, only addressed.
Sample data. Not a sign-off.