From the interval to the signature.
Five stages. Two are configuration and happen once per register.
Import
Assets come in from GIS or CSV, with coordinates and class if it exists. An asset that arrives without a class is not defaulted. It shows on the board as a gap.
SOURCE
GIS, read WFS
COUNT
4,120 assets
CLASS SOURCE
client register
Map
The client’s classes are set against their own standard, and the interval for each class is derived from that mapping. Every change to the scheme is versioned.
CLASS
1
STANDARD REFERENCE
client’s own standard
INTERVAL
30 days
Program
Assets enter the round by interval, in route order, with a device assigned and an offline bundle prepared. The round then runs without signal and syncs on return.
ROUND
north line
INSPECTOR
inspector 03
DEVICE
field tablet 07
Capture
The inspector takes the photo, writes the description and proposes a class. The model shows its confidence beside the proposal, and the proposal is not final.
DEFECT PHOTO PLACEHOLDER
PHOTO
PD-2291, 40 m
TEXT
pérdida de espesor, tramo 40 m
CLASS
1, proposed
CONFIDENCE
0.81
Sign
An engineer reviews the proposal and signs or corrects it. A correction carries a written justification and resets the interval.
LICENCE
4-1182
DECISION
signed
JUSTIFICATION
not required
How long it takes.
STAGE
TIME
Import
1 day
Mapping
3 days
First round
same week
Sample data. Not a sign-off.